Paver Calculator
Work out how many pavers a patio needs, plus the base and bedding sand under them.
Result
Enter length and width to see the result.
https://calcgallery.com/landscaping/paver-calculator/
Results are estimates for planning only. Actual needs vary with site conditions, products and workmanship. Always confirm quantities with your supplier and follow local building codes and manufacturer instructions. Read the full disclaimer
How to use the Paver Calculator
- Measure the patio or path, or enter the area directly.
- Enter the paver size. Use the real dimensions, which are usually a millimetre or two under the nominal.
- Leave the joint gap at zero unless you are deliberately spacing them.
- Read the paver count, plus the sub-base and bedding sand underneath.
- For polymeric joint sand, choose it and enter the coverage per bag from the bag's chart for your joint width.
How it is calculated
Each paver occupies its own size plus any joint gap, on both axes:
Paver module = (length + gap) × (width + gap)Pavers = ceil(area ÷ module × (1 + waste))
Most concrete pavers have small spacer nibs moulded onto the sides and butt together, so the gap is zero. Clay pavers and anything laid to a deliberate joint need the gap entered, because across a large patio it adds up to whole rows.
The two layers underneath are straightforward volumes:
Sub-base = area × sub-base depthBedding sand = area × sand depth
Both are given in cubic yards or metres, which is how they are sold.
Polymeric joint sand
Polymeric sand is swept into the joints once the pavers are down and compacted, then set with water. It is sold by the bag, and the bag says how much area it covers at a given joint width:
Bags = ceil(area ÷ coverage per bag)
The coverage is not something this page can work out from the paver size. The joints are narrow and irregular, the sand settles as the surface is compacted, and the makers publish ranges rather than single figures. Choose the joint width that matches your pavers on the bag’s chart and take the low end of its range; an unopened bag is easier to return than a half-filled joint is to finish on another day.
Practical tips
Compact the sub-base in layers. A 150 mm base put down in one go and whacked once is not compacted, it is loose stone with a flat top. Two 75 mm lifts, each properly compacted, is a base that does not sink in year two.
Get the fall right before you lay anything. A patio wants roughly 1 in of fall per 6 ft, away from the building. Working that out after the pavers are down means lifting them.
Lay to a string line and check every few rows. Small errors accumulate. By the time you notice a row has drifted, you are twenty rows past where the fix was easy.
Cut at the end, all at once. Lay all the whole pavers first, then measure and cut the border in one session. Cutting as you go means changing tools constantly and more mistakes.
Buy pavers from one batch. Like tile, concrete pavers vary in shade between production runs, and a patch of a different batch is obvious across a patio.
With your numbers
- Each paver occupies (9 in + gap) × (6 in + gap)
- Pavers before waste = 180 ft² ÷ that = 480
- With 5% for cuts = 504 pavers
Quick reference
Pavers at the border get cut, and a cut paver rarely fits anywhere else, so this includes an allowance for the layout.
| Job | Pavers to buy |
|---|---|
| 10 × 10 ft patio, 6 × 9 in pavers | 280 |
| 12 × 15 ft patio, 6 × 9 in pavers | 504 |
| 15 × 20 ft patio, 6 × 9 in pavers | 840 |
| 200 ft² path, 4 × 8 in pavers | 945 |
| 200 ft² path, polymeric sand at 50 ft² a bag | 945 |
| 3 × 4 m patio, 110 × 220 mm pavers | 521 |
| 4 × 5 m patio, 110 × 220 mm pavers | 868 |
| 30 m² drive, 110 × 220 mm pavers | 1,302 |
Where the numbers come from
The fixed figures this calculator relies on, and the published source each one was checked against. How the calculators are built and checked
2 sources
Rochester Concrete Products, paver calculator: 5% overage, https://calculator.rochestercp.com/ (Marshalls suggests 10% for block paving, https://marshalls.co.uk/gardens-and-driveways/blog/how-many-square-metres-are-in-a-pack-of-paving)
Used for
- Pavers allowance: 5% extra
Clé Tile, "How much extra tile to buy": 15% for intricate patterns or diagonal layouts, https://www.cletile.com/blogs/cle-education/how-much-extra-tile-to-buy
Used for
- Diagonal or offset pattern allowance: 15% extra
Common questions about the Paver Calculator
- How many pavers do I need for a 12 by 15 foot patio?
- 504 of the common 6 by 9 in size, including 5% for cuts. Without the allowance it is 480, and you would be short the moment you cut the first border paver.
- How deep should the sub-base be?
- Around 100 mm for a patio walked on, and considerably more for anything cars drive on, over well-compacted ground. Requirements vary with soil and use, so treat that as a starting point.
- Why only 5% waste for pavers?
- Because cut pavers are often reusable on the opposite edge, and unopened packs can usually be returned. Tile gets 10% because the offcuts are thin and brittle; pavers are neither.
- How much sand do I need for pavers?
- 15 ft³, or 0.56 yd³, of bedding sand for the page’s default 12 by 15 foot patio at 1 in deep: 180 ft² × 1/12 ft = 15 ft³, and 15 ÷ 27 = 0.56 yd³. That is 8.33 ft³, or 0.31 yd³, for every 100 ft² at 1 in, and 0.5 m³ for 20 m² at 25 mm. The sand goes on top of the sub-base, not instead of it: the sub-base carries the load and the sand lets you level each paver. Joint sand is extra, and is covered below.
- How many bags of polymeric sand do I need?
- The paved area divided by the coverage one bag gives at your joint width. The makers print that as a range, and it narrows as joints widen: one data sheet gives 50 to 75 ft² a 50 lb bag for joints up to 1/4 in, and 15 to 25 ft² for 1/2 to 3/4 in. Enter the low end of your bag’s range and you are unlikely to run short.
- Why does the page not know the coverage of polymeric sand?
- Because it depends on the product, the joint width, and the shape, size and depth of the pavers, and the makers say so on the bag. A figure built into the page would be right for one product and one joint and wrong for the rest.
- What about ordinary jointing sand?
- Plain kiln-dried jointing sand is not estimated. It goes the same way as polymeric sand, into the joints at the end, so if the bag gives a coverage you can use the polymeric option with that figure.
- Should I lay them diagonally?
- You can, and it looks good, but every border paver becomes an angled cut and the waste roughly triples. Choose the diagonal option above and the allowance follows.